Skip to content
TimberStoneDesign and Build Contractors, NanyukiCall us

Design and build contractors, Nanyuki

We build houses on this side of the mountain.Drawings to keys, one firm.

We design and build houses around Nanyuki and across the Mount Kenya region, from the first drawing through county approval to the day you get the keys. We also run our own kiln and joinery workshop, so the doors, ceilings, floors and fitted units in your house are made by us.

  • Our own kiln and joinery workshop
  • Architectural and structural drawings in house
  • Fixed, itemised contract sums
A main house and utility house built by TimberStone at Sweetwaters, near Ol Pejeta, roofed and looking out over the Laikipia plains
7 stages
from the first site visit to the day you get the keys, all in house
Our own kiln
timber dried before it is machined, not after it is fitted
8 counties
Laikipia, Nyeri, Meru, Isiolo and around Mount Kenya

Our work

Follow a build, stage by stage

Every project here is published as a timeline, including the jobs still on site, so you can see exactly how far they have reached.

What we build

From a one room cabin to a four floor block

A family house, a cottage that pays for itself on Airbnb, rental units, a farmhouse with no mains anything, or the extension you should have built five years ago.

How we work

Seven stages, one firm answerable for all of them

Most builds go wrong in the gaps between the architect, the engineer and the contractor. There are no gaps here, because we do all three. Nobody can blame anybody else and you have one number to call.

  1. 01

    Concept and feasibility

    We work out what your plot can take, what it will cost and whether the idea works, before you spend anything on drawings.

    1 to 2 weeks

  2. 02

    Architectural design and drawings

    Full architectural drawings for your bungalow, maisonette or apartment block, drawn by people who will have to build them.

    3 to 5 weeks

  3. 03

    Structural and civil engineering

    Foundations, slabs, columns and roof structures designed and calculated for the ground you are actually building on.

    2 to 3 weeks

  4. 04

    County approvals and permits

    We prepare and submit the drawings, then follow the approval through the county on your behalf.

    4 to 8 weeks, depending on the county

  5. 05

    Construction and concrete works

    Stone and concrete construction by our own team. Foundation, walling, slabs, roofing and plaster.

    Programmed per project

  6. 06

    Joinery and interior fit out

    Doors, ceilings, floors, wardrobes and furniture, milled in our own workshop from timber we dried ourselves.

    Runs alongside finishing

  7. 07

    Snagging and handover

    We walk the house with you, fix the list, and hand over a finished home rather than a nearly finished one.

    1 to 2 weeks

What makes us different

We are the ones who have to come back and fix a warped door

Almost every contractor in Kenya subcontracts the joinery. We mill ours in our own workshop, from timber we dried in our own kiln.

Drying timber properly takes weeks and costs money, which is exactly why it is the step most often skipped. Undried timber shrinks and twists once it is inside a warm finished house. Doors stop closing, floors gap, wardrobe doors go crooked. Because we build the house and make what goes into it, that problem lands on our desk, so we have every reason to get it right the first time.

Solid timber doors and framesTimber ceilingsTimber flooring and skirtingsFitted wardrobes and kitchen unitsFurniture and bespoke pieces

Budget

What does it actually cost?

The question everyone asks first, and the one most contractors dodge until the quote arrives.

Tell us about your plot

Send the location, the plot size and a rough idea of the house you want. We will come back with an honest budget range and what the next step should be.