Sweetwaters holiday-home bungalow, utility house and DSQ

A single-storey holiday-home bungalow at Sweetwaters, near Ol Pejeta, built for an owner who lives in Germany. At the 5 September 2026 update, the bungalow and utility house were roofed, an underground water-storage tank had been constructed, and the project was on schedule.

Location
Sweetwaters, near Ol Pejeta, Laikipia County
Programme
2026
Client
Private owner based in Germany
Stage 1 of 3
70% complete

What we did

  • Single-storey holiday-home bungalow
  • Underground water-storage tank
  • Separate utility house and DSQ
  • Project management from the drawing stage through construction
  • Setting out and site establishment
  • Strip foundations and reinforced ground floor slabs
  • Machine cut stone walling with a reinforced concrete frame and ring beams
  • Timber roof structure and steel sheet roof cover

From drawings to the build

A holiday home taking shape

Designed by Maurine Gitonga. The two-bedroom bungalow has a covered veranda and a separate office. The plans show 127 m² including the veranda, or 111 m² without it. There are also separate staff quarters and a utility building with a carport.

The veranda and front of the Sweetwaters bungalow
The veranda and front of the Sweetwaters bungalow. Drawing by Maurine Gitonga. Open full-size (new tab).
The Sweetwaters bungalow seen from the side
The Sweetwaters bungalow seen from the side. Drawing by Maurine Gitonga. Open full-size (new tab).

Drawings added 9 September 2026. Site progress is from 5 September 2026. The areas come from the plans, not a measurement of the finished buildings. We have kept the owner’s full plans and exact location private.

Build progress

Stage 1 of 3: Construction and concrete works

70%
site progress estimate

Under way now: Construction and concrete works. The 70% is the site estimate across all the work.

  1. 01

    Construction and concrete works

    In progressStarted 2026 · updated 5 September 2026 · on schedule

    Foundations went in during the rains, which is when this ground tells you the truth about itself. Strip footings were cast, then substructure walling in machine cut stone up to damp proof course, with hardcore, blinding and a damp proof membrane under the ground floor slabs. Walling carried up in stone around a reinforced concrete frame, with shuttered ring beams at wall plate level tying each building together. The underground water-storage tank has been constructed, and the bungalow and utility house are now roofed. Regular dated site updates are sent to the owner in Germany while work continues to programme.

    Timber formwork prepared for a concrete slab at the Sweetwaters project.
    Foundation work underway for the Sweetwaters holiday-home bungalow, utility house and DSQ.
    The underside of a reinforced concrete slab under construction at Sweetwaters.
    Machine-cut stone walling and reinforced concrete frame work at Sweetwaters.
    The roofed bungalow and utility house at TimberStone's Sweetwaters project, near Ol Pejeta.
    Aerial progress view of the roofed single-storey Sweetwaters holiday-home bungalow with its separate utility building behind it.
    Front elevation progress view of the Sweetwaters holiday-home bungalow showing its stone walling, pitched roof and covered veranda.
  2. 02

    Joinery and interior fit out

    Still to come

    Doors, windows, ceilings, wardrobes and floors for all three buildings, milled and dried in our own workshop.

  3. 03

    Snagging and handover

    Still to come

    We walk the house with you and write down everything still outstanding. We finish that list before we ask for the last payment.

Photographs

Timber formwork prepared for a concrete slab at the Sweetwaters project.
Foundation work underway for the Sweetwaters holiday-home bungalow, utility house and DSQ.
The underside of a reinforced concrete slab under construction at Sweetwaters.
Machine-cut stone walling and reinforced concrete frame work at Sweetwaters.
The roofed bungalow and utility house at TimberStone's Sweetwaters project, near Ol Pejeta.
Front elevation progress view of the Sweetwaters holiday-home bungalow showing its stone walling, pitched roof and covered veranda.
See all projects

Planning your own build from abroad?

See how to start with your plot and brief, what to agree before construction, and the details to include in an enquiry.

Build in Kenya while living abroad

Planning a build in Kenya from abroad?

Send your plot location, drawings or brief, and where you are based. We will explain the quotation, programme and site-update process for your project.

Privacy choices

May we use Google Analytics and record page visits and contact clicks to measure enquiries? Both are off until you allow it. Enquiry text is not collected. No advertising tracking.