Building an apartment block

An apartment block is a different level of project. The structure has to be calculated, the approvals take longer, and the water, waste and electrics are designed for the whole block at once.

Small blocks commonly run KES 55,000 to KES 85,000 per square metre of built area.

Related TimberStone work in Laikipia

See the recorded scope and progress. These examples are not a quotation or a claim that every building type shown on this site has been completed.

Nanyuki, Laikipia County · On site now

45-unit apartment development and penthouse in Nanyuki

A multi-storey residential development in Nanyuki comprising 45 dwelling units and a luxury penthouse. TimberStone's work started at foundation setout, and the building is now 80% complete with a 13-person passenger lift, ground-floor parking, broad balconies and a 200,000-litre underground water tank feeding 11 rooftop tanks.

View the project record and photographs

What changes above two floors

Once you go past two floors, the reinforced concrete frame is doing the work and the walls are just infill. That means the structural engineer leads the design, the foundation is sized on calculated loads rather than experience, and the concrete has to be tested rather than trusted.

The approval route lengthens too. Depending on size and location you may need a NEMA project report, a fire access review and a formal drainage design, and those take time that has to be in the programme from the start.

  • Engineered frame, tested concrete, certified steel
  • Water storage, pumps and a riser designed for the whole block
  • Waste and stormwater designed as one system
  • Parking and setbacks decided by the county before the design is fixed

Where the money goes

On a small block, roughly a third of the cost sits in the frame and slabs, and about a fifth in finishes. Lifts, generators and boreholes are the items that move a budget most, so decide on them early rather than adding them at the end.

Questions we get asked

How long does approval take for an apartment block?
Plan for three to six months from the day drawings are submitted, longer where a NEMA project report is required. Counties differ, and the queue matters as much as the paperwork.

Prepare the scope before asking for a price

  • Send the exact plot location and the type of building you need.
  • Include the approximate floor area, any existing drawings and the work already done.
  • List what belongs in this quotation, including any external works or fit-out.

Planning an apartment block?

Tell us the plot and roughly what you have in mind. We will come and look, then give you an itemised figure and a programme.