Skip to content
TimberStoneDesign and Build Contractors, NanyukiCall us
More pages
Laikipia CountyAbout 1,800m

Off grid homes builders around Rumuruti

Off grid means the house makes its own power, finds its own water and deals with its own waste. Around Laikipia people mostly do it for practical reasons, because the nearest transformer is three kilometres away and nobody is coming to move it.

Typical 120m² build
KES 5.76M to KES 9.36M
Per square metre
KES 48,000 to 78,000
From our workshop
About an hour and a half from Nanyuki.

What an off grid home costs around Rumuruti

Worked out at Rumuruti and Laikipia West prices, not a national average. Rumuruti and Laikipia West sits in the Nanyuki and Laikipia pricing region, so material costs are much the same as at our base.

Services on a fully off grid house typically add KES 1.5M to KES 4M to the build.

For a 120m² build over one storey at a standard finish, that comes to roughly KES 5.76M to KES 9.36M around Rumuruti. That is the shell and the finishes. Professional fees, county charges, water, power, waste and external works sit on top, and the calculator adds them one at a time so you can see what each costs.

Why the figure moves

Materials cost what they cost at the quarry and the hardware. What changes between one town and the next is getting them to site. Rumuruti and Laikipia West carries a haulage factor of 1.00 against our Laikipia base rate, so material costs are much the same as at our base.

Ground conditions move it further, and on some plots they move it more than haulage does. That is what the next section is about.

Building an off grid home around Rumuruti

What the ground, the weather and the water do to this kind of build here.

Water is the first question

Rainfall is lower and less reliable than on the mountain side. Storage has to be sized for a dry year rather than an average one, and roof area becomes a design decision rather than a consequence.

Dust, sun and wind

Open ground means wind driven dust and hard sun. Deep eaves, quality exterior paint and heavier roofing gauge earn their money.

Access and distance

Deliveries cost more the further you are from the tarmac. Building in fewer, larger stages saves real money here.

What we do on an off grid home build

  • Solar, battery and backup sizing based on your real loads
  • Rainwater harvesting, storage and filtration
  • Borehole coordination, from survey through permits to equipping
  • Septic and biodigester systems designed for your ground
  • Houses built to hold heat, which is what makes low energy living comfortable here

Approvals around Rumuruti

Laikipia County approves the plans. Boreholes require Water Resources Authority permits and a hydrogeological survey first.

Questions people ask about an off grid home

How much does an off grid house cost in Kenya?

The house itself costs the same as any other. The services are the difference, and a full package of solar with storage, rainwater harvesting, storage tanks and a biodigester usually adds KES 1.5M to KES 4M. A borehole on top of that adds KES 900,000 to KES 3M depending on depth.

Is off grid cheaper than connecting to Kenya Power?

It can be, and the deciding factor is distance. If poles have to be run to your plot, a connection can run into the hundreds of thousands and you still pay a bill every month. If a transformer is at your gate, connecting is cheaper up front and solar becomes a backup rather than a replacement.

Planning an off grid home around Rumuruti?

Tell us the plot and roughly what you have in mind. We will come back with an honest budget range and what the next step is.